Building Progress

We paid a brief visit to our Dipolog house and lot yesterday to check on progress and the house is beginning to take shape with the shuttering for the outer walls of ground floor 80% completed. Interior shuttering of maids room, general toilet, Dirty kitchen all completed.

Door frames have been installed however two frames need changing around as exterior doors need to open outwards giving more room in the interior of house. Having outwards opening doors I believe ads to safety and security. If someone tries to force entry they have to break the door frame and in event of fire it is easier to push the door open.

I am pleased with method of construction using reinforced poured concreate as opposed to blocks so house will better withstand any earth tremors. I need to check wiring plans as it seems some electrical plan updates may be missing, but as I believe these are on the upper floor it should not delay work.

Dipolog house and lot for sale

No comments:

Post a Comment