Dipolog house and lot for sale
Are Philippine Building Contractors Trustworthy
Another week has past with little progress on the outstanding items apart from the glass rack which has finally arrived and was fitted to our home bar. Some modification was required, but now at last we no longer have to reach into cupboards for glasses.
I called at the site engineers office to find that the resident engineer is on maternity leave. So I invited another engineer to review the status of my list. He was surprised to see the half completed hole in the wall of the dirty kitchen, and the draining board in the main kitchen which had been installed directly onto concrete, with the result it could not drain properly and also did not have any give to prevent breakages is plates or glasses slipped from wet hand.
I then pointed out the light switches in the bathrooms which have become a safety hazard as they are coming away from the wall. They were meant to have been installed outside the rooms to ensure water and electricity cannot come in contact.
Finally I pointed out that the pavement and roadside flower border outside my property had been destroyed during construction and needed to be replaced. I also comment that there was a severe lack of maintenance within the complex with overgrown lots, and a swimming pool fir only for frogs and hope that matters improved by the end of the month, as summer is coming fast.
No comments:
Post a Comment