Dipolog house and lot for sale
Progress UpdateYesterday we paid our weekly visit to Mediatrix hills to view progress on our Dipolog house and lot for sale, as we drew up to the office Jasmin noticed that the roof trusses were now in place, but wee had some outstanding issues to be resolved.
We started off by speaking with the site engineer, with reference to the bathroom and if there was room for the chosen bath. Apparently the bath is bigger than the room, now why were we not advised of this before construction was even commenced and why was the Architect not informed of the potential problem. The site engineers answer was that she is responsible for building to the plans, and produced a small comply of the plan which we had signed off as part of the contract, the dimension of the bathroom are not shown. the conversation became quite heated and the engineer fled.
Eventually another women intervened and said she was looking to find a resolution. apparently we are not the first clients to have design problems. I suggested that the problem is the result of clients not seeing the full size plans, or the computer CAD plans, in fact yesterday was the first time I had seen the computer plans in detail and it began to raise more questions as well as answer others. Communications it seems is the issue and perhaps this will be resolved by next week. We raise one new issue regarding what type of shower was to be fitted in the upstairs bathroom as we had chosen a shower with body jets and just wanted to be sure.
Progress on the house has been going on at quite a pace, we arrived during lunch break so workers were lying around sleeping. The shuttering on the downstairs ceiling has been removed and the cocreate poured ceiling is not showing any cracks. We inspected the disputed bathroom and as walls have been completed, we might be forced to fit a corner bath. At first we were concerned about the low wall being built on the terrace as we were expecting metal railings, however having seen the CAD this morning it would seem that a small roof section has been added in order to conceal rain guttering around the terrace. more communications problems.
No comments:
Post a Comment