Sunday, August 26, 2012

Dipolog House and Lot For Sale

Original Article @ Dipolog house and Lot for Sale

Dipolog house and lot for sale
Are Philippine Building Contractors Trustworthy

Well, it has has been some time since I last updated this blog and we are now nearing the end of August so what has been happening. One major success the light switches have been moved outside of the bathrooms and this month they have just started work to clear up the site. the grass on vacant plots had grown so high that snakes we starting to move. now in the last week, they have cleared the lots and i have been told that in due course they will be leveling the ground and laying buffalo grass so that, the small maintenance crew will be able to keep it under control.

The swimming pool is still empty but they have started to landscape that area as well and plan to build a fence around it to keep out the frogs, so we will see how that works, maybe it will be open for Christmas.

As all this maintenance was started, we received a bill for maintenance from January, so I when to the office and said why were they charging maintenance as there was still work outstanding and we had not accepted the house, or received the title deeds so they cannot charge maintenance dues.

I was promised that the site engineer would visit to arrange rectification of our Sink top and removal of our gas cylinder to outside the house on the grounds of safety, I was surprised to learn that unlike most counties LPG tank can be installed in a kitchen with the result that a small leak could blow up the house, at least when outside the gas is more likely to dissipate. The stainless steel sink top was laid on a concrete base with the result that if crockery slips out of your hand when washing it is highly like to smash as there is no give in the draining board.

Till the next time

David Ogden
Dipolog city
+63659082832
Ed Mercer 100 Millionaiers challenge

No comments:

Post a Comment