Dipolog house and lot for sale
Progress ReportProgress on our Dipolog house and plot seems to have slowed over the past week, as the workers are continuing to pour the cocreate walls, it seems to be slow going with one bucket full at a time needing to be lifted up and poured down the gap.
We did note that conduit pipes for the electrical system had been placed within the shuttering prior to pouring so the wires can be run later. we questioned the onsite engineer regarding the hot water supply and it seems we will have a central tank system. Jasmin also requested a sliding shower screen to be fitted around the bath to avoid flooding the bathroom.
Hopefully when we next go to Dipolog they will be starting work on the top story.